Wärtsilä supplying engines to Turkey

Wärtsilä will supply four 50SG engines running on natural gas for a 73 MW power plant extension project owned by Yesilyurt Enerji Elektrik Uretim in Turkey.

The equipment will be used in the extension of an existing 128 MW Wärtsilä power plant built in 2011 in Samsun, on the Black Sea coast of Turkey. The capacity of the plant was extended to 145 MW in 2013.

Source: Wärtsilä

Leave a Reply

Your email address will not be published. Required fields are marked *